Find Your Daily Voice
Norwalk
Your Local News for Norwalk and Rowayton, Connecticut
Tuesday, dec 17
52°
Follow
News
Schools
Business
Obituaries
Police & Fire
Weather
Lifestyle
Politics
Sports
Traffic
Real Estate
Tags
Jobs
Shop
Support Us
Norwalk
Follow
Find Your Daily Voice
News
Schools
Business
Obituaries
Police & Fire
Weather
Lifestyle
Politics
Sports
Traffic
Real Estate
Tags
Jobs
Shop
Support Us
Home
About us
All sites
Advertise with us
Contact us
Terms of use
Privacy policy
Code of ethics
Site Map
© 2024 Cantata Media
52°
Tuesday, dec 17
Tag:
Route 1, Stamford, CT
Traffic
Roadwork Alert: I-95 Stretch Will Be Shut Down Both Ways For Bridge Replacement
Motorists have been advised to avoid a stretch of I-95 as contractors prepare to kick off work on an overpass that is getting a multi-million dollar overhaul in the area, likely leading to lengthy delays for drivers passing through the area. The Connecticut State Department of Transportation announced plans to replace the Route 1 overpass at Exit 9 in Stamford with a new steel and concrete structure over the summer. Construction is scheduled for the weekends of Friday, May 31 and Friday, June 7 and is expected to cost approximately $15 million. The DOT said that the project will be using an…
News
Expect Delays: I-95 Shutdowns Scheduled During $15M Overhaul
Motorists have been advised to avoid a stretch of I-95 as contractors prepare to kick off work on an overpass that is getting a multi-million dollar overhaul in the area, likely leading to lengthy delays for drivers passing through the area. The Connecticut State Department of Transportation announced plans to replace the Route 1 overpass at Exit 9 in Stamford with a new steel and concrete structure over the summer. Construction is scheduled for the weekends of Friday, May 31 and Friday, June 7 and is expected to cost approximately $15 million. The DOT said that the project will be using an…
News
Expect Delays: I-95 To Be Reduced To Two Lanes During Roadwork
An I-95 overpass is getting a multi-million dollar overhaul in the area, which may lead to lengthy delays for drivers passing through the area. The Connecticut State Department of Transportation announced plans to replace the Route 1 overpass at Exit 9 in Stamford with a new steel and concrete structure over the summer. Construction is scheduled for the weekends of May 31 and June 7 and is expected to cost approximately $15 million. The DOT said that the project will be using an Accelerated Bridge Construction process, which entails building the new bridge spans next to the current bridge b…
News
Details Announced For $15M I-95 Bridge Replacement Project
An I-95 overpass is getting a multi-million dollar overhaul in Connecticut, which may lead to lengthy delays for drivers passing through the area. The Connecticut State Department of Transportation announced plans to replace the Route 1 overpass at exit 9 in Stamford with a new steel and concrete structure over the summer. Construction is scheduled for the weekends of June 1 and June 1 and is expected to cost approximately $15 million. The DOT said that the project will be using an Accelerated Bridge Construction process, which entails building the new bridge spans next to the current bridg…
Traffic
I-95 Reopens; Flooding Reported On Numerous Roadways
This story has been updated. A new round of thunderstorms with heavy downpours resulted in flooding throughout Fairfield County with a stretch of I-95 closed for a portion of the Thursday evening commute. The closure occurred southbound between Exit 15 and Exit 16 in Norwalk. The northbound side in that area had one lane open. The roadway reopened in both directions around 6 p.m. Shortly after, a vehicle stalled in the center lane, leading to new delays. Flooding also led to the closure of a lane on the northbound Merritt Parkway between Route 120A/King St (Exit 27) and Round Hill Road (E…