The roadway, which average 550 vehicles a day, had been closed to realign the roadway and replace bridge D-32 over Coopertown Brook.
Motorists will continue to see ongoing work over the next several weeks including the installation of permanent guide rail, removal of the old bridge, grading work along the old roadbed and bridge site, as well as miscellaneous clean-up work that may result in one-lane traffic patterns for limited period, but will not require additional road closures.
Click here to follow Daily Voice and receive free news updates.