SHARE

Update: No One Injured When Part Of Park Ridge Ceiling Collapses

PARK RIDGE, N.J. — The driver of a FedEx truck got out OK after a rear ceiling of the Hertz Building in Park Ridge collapsed Tuesday night, responders said.

A burst pipe caused the partial roof collapse.

A burst pipe caused the partial roof collapse.

Photo Credit: COURTESY: Hackensack FD
No injuries were reported. A FedEx truck was damaged.

No injuries were reported. A FedEx truck was damaged.

Photo Credit: Hackensack Fire Department
The Hertz Building is on Brae Boulevard in Park Ridge.

The Hertz Building is on Brae Boulevard in Park Ridge.

Photo Credit: Google Maps

The 75-by-75-foot section toppled above a rear loading dock at the Brae Boulevard building after a frozen water pipe burst around 6 p.m., they said. No injuries were reported, and damage apparently was limited to the truck.

Borough police and firefighters responded, along with the Hackensack Fire Department, while an ambulance as put on standby but wasn't required, responders said.

The sprinkler system was shut down and the building evacuated, they said.

The owner was on scene, with hopes that the building could be reopened Wednesday.

to follow Daily Voice Northern Highlands and receive free news updates.

SCROLL TO NEXT ARTICLE