NORWALK, Conn. — Bridge maintenance work will be conducted Nov. 2 through Nov. 10 on various bridges on Route 7 northbound on Norwalk, the Connecticut Department of Transportation said.
The following bridges will be affected:
- Bridge over Connecticut Avenue
- Bridge over Maple Street
- Bridge over Union Park South
- Bridge over US 1 Belden Avenue
- Bridge over Norwalk River
- Bridge over Route 123, New Canaan Avenue
The repairs are being performed by Costello Industries.
Motorists can expect lane closures. There will be traffic control personnel and signing patterns to guide motorists through the work zone. The regular work schedule is from 9 a.m. to 4 p.m., Monday through Friday.
Modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.
Click here to sign up for Daily Voice's free daily emails and news alerts.